Wind Power Industry News
2023/07/03 17:03
Recently, the 35kV switchyard, power collection line and wind farm of Chayouqianqi Lake Huangqi 30000kW distributed wind power project, which was contracted by Shanghai Electric Power Transmission and Distribution Engineering Co., Ltd., successfully transmitted power back once. The first wind turbine was successfully connected to the grid for power generation, and the equipment operated normally and stably.