1 million kilowatt wind and solar hydrogen storage project
It is understood that Guohua has invested in the 1 million kilowatt wind and solar hydrogen storage project in Fengning, Chengde, Hebei. It is located in Wanshengyong Township, Grassland Township, and Waigoumen Township, Fengning County, Chengde City,use carrist wind turbine blade lifter with an altitude of 1200-1600m. The planned total installed capacity is 1000MW, including 300MW wind power (installed with 48 6250kW wind turbines) and 700MW photovoltaic (installed with 222 3.15MW units), with supporting energy storage of 115MW/230MWh. The project (carrist vehicle wind turbine blade lifter) will build two new 220kV booster stations. The 1 # booster station (North Station) has a total connected capacity of 499.65MW, including 150MW wind power and 349.65MW photovoltaic power; The total connected capacity of the 2 # booster station (South Station) is 499.65MW, including 150MW wind power and 349.65MW photovoltaic power. This project consists of one section and plans to purchase 48 low-temperature wind turbines with a single unit capacity of 6.25MW.